l Customer pain points
In September 2017, the temperature of supercharger bearing rose slowly to 92℃, with the risk of jumping.
l Device name: 40,000 air division supercharger
Fix the problem: Remove the varnish
l Oil details
Tank capacity: 6m³
Oil brand: 46# Turbine oil
Oil service life: 2.5 years
l Use our solution
Oil cleaning model No. : WVD-II varnish removal machine
Operation time: November 2017 till now
l Before purification
Unit operation: In September 2017, the temperature of the supercharger bearing rose slowly; In November 2017, the bearing temperature rose to 92℃
l After purification
Operation of the unit: 7 days after commissioning, the bearing temperature is stable and does not rise; 15 days after use, the bearing temperature began to drop; 2 months later, the bearing temperature drops to about 85℃, meeting the technical requirements.